Home/Blog/Build Log: 3 PRs across 2 repos

Build Log: 3 PRs across 2 repos

3 PRs merged across 2 repos since 2026-04-24. 407 lines added, 282 removed.

build-logvellymon-gamevargasjr-dev

## vellymon.game

2 PRs merged:

- **#192** fix: stable team colors + team-colored occupation tiles (+14 lines) - **#193** feat: two-stage command panel + directional harvest + attack index fix (+111 lines)

## vargasjr.dev

1 PRs merged:

- **#746** fix: increase DAYS_BACK to 4 to close gap between Fri/Tue runs (+0 lines)

---

*Generated automatically from 3 merged PRs between 2026-04-24 and 2026-04-28.*